Boss Resources (ASX: BOE) Honeymoon Preliminary Feasibility Study completed, confirming highly economic project

ASX Announcement as of 31.05.2017 HONEYMOON PRE-FEASIBILITY STUDY HERALDS NEAR TERM PRODUCTION POTENTIAL HIGHLIGHTS Honeymoon Preliminary Feasibility Study completed, confirming highly economic project  Low capital outlay optionality for near term production o US$10M re-start of existing Solvent Extraction Plant for production of 0.88Mlbs per annum U308 equivalent, with 12 months to first production 

Paladin Energy to proceed with potential sale of Langer Heinrich mine

ASX and TSX-listed Paladin Energy has announced that CNNC Overseas Uranium Holding could be entitled to acquire Paladin Energy’s interest in the Langer Heinrich mine. On 23 March 2017, Paladin Energy announced it had resolved to commence arbitration proceedings against China National Nuclear Corporation’s (CNNC’s) Overseas Uranium Holdings subsidiary, asserting that no ‚event of default‘

Skyharbour Intersects High Grade Uranium in Multiple Drill Holes Including 9.12% U3O8 over 1.4m at Newly Discovered Maverick East Zone as well as 5.29% U3O8 over 2.5m at Main Maverick Zone on the Moore Uranium Project

May 23, 2017 Vancouver, BC – Skyharbour Resources Ltd. (TSX-V: SYH)(OTCQB: SYHBF)(Frankfurt: SC1P) (the „Company“) is pleased to announce the results from its first phase, winter 2017 diamond drilling program at its flagship 35,705 hectare Moore Uranium Project, located approx. 15 kilometres east of Denison Mine’s Wheeler River project and near regional infrastructure on the southeast side

Indian units to boost domestic nuclear industry

18 May 2017 Indian Prime Minister Narendra Modi has described his Cabinet’s approval of the construction of ten indigenously designed pressurised heavy water reactors (PHWR) as a „big boost“ for his Make in India program of localised manufacturing. The Cabinet, chaired by Modi, yesterday approved the construction of ten 700 MWe units in a „significant decision